Home >> News & Events

Operating Steps of Thermal Shock Chamber

Jan. 04, 2018

In general, thermal shock chamber operation is divided into five steps: pretreatment, initial testing, testing, recovery, the final test.


Thermal Shock Chamber


Detailed process content:

1. Pretreatment: the test sample is placed in the normal test atmospheric conditions until it reaches a temperature stable.

2. Lnitial test: the measured samples and standard requirements of control, in line with the requirements directly into the high and low temperature impact test box can be.

3. Test: According to the sample size and size of the space, the time may be slightly wrong.

4. Recovery: After the test sample is taken out of the test chamber, the test sample shall be recovered under normal test atmospheric conditions until the test sample reaches a stable temperature.

5. The final test: control standards in the degree of damage and other methods of test results assessment.


Welcome contact us for the thermal shock chamber price/quote.



  • E-mail: Contact@aslitesting.com
  • Tel: +86 769 2316 4266
  • Fax: +86 769 2285 1784
  • Add: JinHui Industrial Park, LiXin Town, East City District-523125, DongGuan, China.

Copyright © AI SI LI (China) Test Equipment Co., Ltd. All Rights Reserved | Sitemap  

Top

Contact Us